2589800000 - PVC Cable Duct 60x80mm, 2m Long, Lead-Free Material (Pack of 24)
2589800000 - PVC Cable Duct 60x80mm, 2m Long, Lead-Free Material (Pack of 24)
SKU: SKU: 2589800000 Download PDF
- 2589800000 - PVC Cable Duct 60x80mm, 2m Long, Lead-Free Material (Pack of 24)
- 2589800000 - PVC Cable Duct 60x80mm, 2m Long, Lead-Free Material (Pack of 24)
- 9031860000 - Steel Tool 260mm Wide with 95mm Thickness
- 7940006079 - 12.5mm Wide Polyamide Cable Ties, 500mm Length, 50 Pack (Pack of 50)
- 7940006071 - 100-Pack 7.5mm Polyamide Cable Ties, 450mm Length (Pack of 100)
- 7940006070 - Durable Polyamide Cable Tie 7.5mm x 450mm, 540N Strength (Pack of 100)
- 7940006064 - 7.8mm Wide Polyamide Cable Ties, 180mm Length, 540N Strength, Pack of 100 (Pack of 100)
- 7940006059 - Polyamide Cable Ties 4.5mm x 390mm with 220N Strength (Pack of 100)
- 7940006055 - 250mm Polyamide Cable Ties with 220N Strength (Pack of 100)
- 7940006051 - 200mm Polyamide Cable Ties, 80N Strength, Pack of 100 (Pack of 100)
- 7940006050 - 2.6mm Polyamide Cable Ties, 200mm Length, 80N Strength (Pack of 100)
- 7940006049 - Durable Polyamide Cable Ties, 2.6mm x 160mm, 80N Strength (Pack of 100)
- 7940006047 - 135mm Polyamide Cable Ties, 80N Strength, RoHS Compliant (Pack of 100)
- 2662660000 - PVC Cable Duct 2000mm x 25mm, Lead-Free, RoHS Compliant (Pack of 60)
- 2662650000 - PVC Cable Duct 40mm x 40mm, 2m with Lead-Free Lid (Pack of 40)
- 2662640000 - 2000mm PVC Cable Duct, 100mm H x 60mm W, RoHS Compliant (Pack of 16)
- 2662630000 - 100mm x 40mm PVC Cable Duct in Blue with Lid (Pack of 16)
- 2662620000 - Lead-Free PVC Cable Duct 100mm x 25mm, 2000mm Length (Pack of 24)
- 2662610000 - 2000mm PVC Cable Management Profile, 80mm x 25mm (Pack of 32)
- 2662600000 - 60mm x 25mm Blue PVC Cable Duct for Efficient Management (Pack of 40)
- 2662590000 - Lead-Free PVC 100x100mm CD-BO with 4/6 Slit Design (Pack of 16)
- 2662580000 - 100x80mm Lead-Free PVC Cable Duct, 2m Length (Pack of 16)
- 2662570000 - 80mm x 100mm PVC CD, 2000mm Length, RoHS Compliant (Pack of 16)
- 2662560000 - 80x80mm PVC Cable Duct, 2m Blue, RoHS Compliant (Pack of 24)
- 2662550000 - 80mm x 60mm Lead-Free PVC Cable Duct, 2m Length (Pack of 24)
- 2662540000 - 80x40mm Lead-Free PVC Cable Duct, 2000mm Length (Pack of 24)
- 2662530000 - 2000mm PVC Cable Duct, 60mm x 100mm, RoHS Compliant (Pack of 20)
- 2662520000 - PVC Cable Duct 60x80mm, 2000mm Length, RoHS Compliant (Pack of 24)
- 2662490000 - PVC Cable Duct 60mm x 60mm with Slit Features (Pack of 24)
- 2662480000 - 2000mm PVC Cable Duct, 60mm Height, RoHS Compliant (Pack of 36)
- 2662470000 - 2M PVC Cable Duct, 40x80mm, RoHS Compliant, Slotted Panel (Pack of 24)
- 2662460000 - 40mm x 60mm PVC Cable Duct, 2000mm Length (Pack of 24)
- 2659540000 - Durable Polyamide Cable Ties, 7.5mm x 365mm, 540 N Strength (Pack of 100)
- 2659530000 - 100 Pack 4.5mm x 290mm Durable Cable Ties, Polyamide 66 (Pack of 100)
- 2659520000 - Durable 4.8mm Cable Tie, 200mm Long, 220N Strength (Pack of 100)
- 2659510000 - 3.5mm Polyamide Cable Ties, 180 N Strength, 50mm Max Bundle (Pack of 100)
- 2659500000 - 3.5mm x 140mm Polyamide Cable Ties, 100 Pack (Pack of 100)
- 2659490000 - 2.5mm Polyamide Cable Ties, 98mm Length, 80N Strength (Pack of 100)
- 2659480000 - 365mm Polyamide Cable Ties, 540N Strength, Pack of 100 (Pack of 100)
- 2659470000 - 290mm Polyamide Cable Ties, 4.5mm Wide, 220N Strength (Pack of 100)
- 2659460000 - 4.8mm x 200mm Polyamide Cable Ties, 220N Strength (Pack of 100)
- 2659450000 - 3.5mm x 200mm Polyamide Cable Ties, 180N Strength (Pack of 100)
- 2659440000 - 3.5mm x 140mm RoHS Compliant Cable Ties, 100 Pack (Pack of 100)
- 2659430000 - 100 Pack 2.5mm x 98mm RoHS Cable Ties, 80N Strength (Pack of 100)
- 2659420000 - 365mm Polyamide Cable Ties, 7.5mm Width, 540N Strength (Pack of 100)
- 2659410000 - 4.5mm x 290mm Polyamide Cable Ties - 220N Strength (Pack of 100)
- 2659400000 - 200mm Polyamide Cable Ties, 4.5mm, 220N Strength (Pack of 100)
- 2659390000 - Durable 3.5mm Polyamide 66 Cable Ties, 200mm Length (Pack of 100)
- 2659380000 - Polyamide Cable Ties 3.5mm x 140mm, 180N Strength (Pack of 100)
- 2659370000 - 2.5mm Polyamide Cable Ties, 98mm, 100 Pack (Pack of 100)
- 2659360000 - Durable Polyamide 7.5 x 365 mm Cable Ties, 540 N Strength (Pack of 100)
- 2659350000 - 290mm Polyamide Cable Tie, 4.5mm Width, 220N Strength (Pack of 100)
- 2659340000 - 100 Pack of 4.8mm x 200mm RoHS Compliant Cable Ties (Pack of 100)
- 2659330000 - UV-Resistant Polyamide Cable Ties 3.5x200mm, 130N Tensile Strength (Pack of 100)
- 2659320000 - 3.5mm Wide Polyamide Cable Tie, 140mm Length, 130N Strength (Pack of 100)
- 2659310000 - 2.5 x 98 mm Polyamide Cable Ties, 80N Strength (Pack of 100)
- 2590190000 - 75mm x 100mm PVC Cable Duct, 2000mm Length (Pack of 16)
- 2590180000 - PVC Cable Duct 75mm x 75mm, 2000mm Length (Pack of 16)
- 2590170000 - PVC Cable Duct 50mm x 75mm, 2000mm Length, Slotted Design (Pack of 24)
- 2590160000 - PVC Cable Duct 75mm x 125mm, 2m Length, RoHS Compliant (Pack of 12)
- 2590150000 - 75mm x 50mm PVC Cable Duct, 2000mm Length (Pack of 24)
- 2590140000 - PVC Cable Duct 50mm x 100mm, 2000mm Length (Pack of 16)
- 2590130000 - 15mm PVC Cable Duct Cover, 2000mm Length, UL V-0 Rated (Pack of 2)
- 2590120000 - 50mm PVC Cable Duct, 2m Length, RoHS Compliant (Pack of 24)
- 2590110000 - 25mm x 2000mm Lead-Free PVC Cable Duct Cover (Pack of 2)
- 2590100000 - Gray PVC Cable Duct Cover, 37.5mm x 2000mm, Snap-On (Pack of 2)
- 2590090000 - Dark Grey 75mm Cable Duct, 2m Long, Halogen-Free (Pack of 32)
- 2590080000 - 40mm Gray PVC Cable Duct Cover, Snap-On Design (Pack of 2)
- 2590070000 - 50mm PVC Cable Duct Cover, 2000mm Long, RoHS Compliant (Pack of 2)
- 2590060000 - Halogen-Free 50mm x 37.5mm Cable Duct, 2000mm Long (Pack of 32)
- 2590050000 - PVC Cable Duct Cover, 60mm x 2000mm, RoHS Compliant (Pack of 2)
- 2590040000 - Dark Grey 2000mm Halogen-Free Cable Duct, 37.5mm x 37.5mm (Pack of 48)
- 2590030000 - 75mm PVC Cable Duct Cover with Snap-On Lid (Pack of 2)
- 2590020000 - 80mm Lead-Free PVC Cable Duct Cover for Durable Protection (Pack of 2)
- 2590010000 - 2000mm Halogen-Free Cable Duct, 75x25mm, RoHS Compliant (Pack of 32)
- 2590000000 - PVC Cable Duct Cover 100mm x 2m, RoHS Compliant (Pack of 2)
- 2589990000 - 120mm PVC Cable Duct Cover, RoHS Compliant, 2m Length (Pack of 2)
- 2589980000 - Halogen-Free 50mm x 25mm Dark Grey Cable Duct, 2000mm Length (Pack of 52)
- 2589970000 - 125mm Grey PVC Cable Duct Cover, 2000mm Length (Pack of 2)
- 2589960000 - 37.5mm Halogen-Free Cable Duct, 2000mm Long, RoHS Compliant (Pack of 64)
- 2589950000 - 150mm x 2000mm RoHS PVC Cable Duct Cover with Lid (Pack of 2)
- 2589940000 - 200mm x 2000mm RoHS PVC Cable Duct Cover (Pack of 2)
- 2589930000 - Halogen-Free Cable Duct 2000mm x 25mm for Easy Mounting (Pack of 84)
- 2589920000 - Lead-Free PVC Cable Duct 60x40mm, 2000mm Long (Pack of 36)
- 2589910000 - 2000mm Lead-Free PVC Cable Duct, 80mm H x 40mm W (Pack of 24)
- 2589900000 - 75x125mm Halogen-Free Cable Duct, PC-ABS, 2000mm Length (Pack of 12)
- 2589890000 - 40mm x 60mm Lead-Free PVC Cable Duct, 2000mm Length (Pack of 24)
- 2589880000 - Halogen-Free Cable Duct 75x100mm, 2000mm Length (Pack of 16)
- 2589860000 - Halogen-Free Cable Duct 50mm x 100mm with Lid (Pack of 16)
- 2589850000 - 60mm PVC Cable Duct, 2000mm Length, Gray (Pack of 24)
- 2589840000 - PVC Cable Duct 80x60mm, V-0 Rated, 2m Length (Pack of 24)
- 2589830000 - 75mm Halogen-Free Cable Duct, 2000mm Length (Pack of 16)
- 2589820000 - PVC Cable Duct 40mm x 80mm, Fire-Resistant & RoHS Compliant (Pack of 24)
- 2589810000 - Halogen-Free 50mm x 75mm Cable Duct, 2000mm Long (Pack of 24)
- 2589790000 - 80mm PVC Floor Cable Duct with Halogen-Free Safety Features (Pack of 24)
- 2589780000 - 2000mm Halogen-Free Cable Duct, 75x50mm, RoHS Compliant (Pack of 24)
- 2589770000 - 2000mm Halogen-Free Cable Duct, 50x50mm, UL Compliant (Pack of 24)
- 2589760000 - 60mm x 100mm PVC Cable Duct with Slits, 2000mm Length (Pack of 20)
- 2589750000 - Halogen-Free Cable Duct 2000mm x 75mm, V-0 Rated (Pack of 32)
- 2589740000 - PVC Cable Duct 80mm x 100mm for Floor Installation (Pack of 16)
- 2589730000 - 50mm x 37.5mm Halogen-Free Cable Duct, 2000mm Length (Pack of 32)
- 2589720000 - 2000mm Halogen-Free PC-ABS Cable Duct, 37.5x37.5mm (Pack of 48)
- 2589710000 - PVC Cable Duct 60x40mm, 2m Length, Lead-Free (Pack of 36)
- 2589700000 - Halogen-Free 75mm x 2000mm Cable Duct with Lid (Pack of 32)
- 2589690000 - 80mm x 40mm PVC Cable Duct, 2000mm Long (Pack of 24)
- 2589680000 - 2000mm Halogen-Free Cable Duct, 50mm Height, 25mm Width (Pack of 52)
- 2589670000 - PVC Floor Cable Duct 40mm x 60mm, 2m Length (Pack of 24)
- 2589660000 - Light Grey Halogen-Free Cable Duct 37.5x25mm, 2000mm Long (Pack of 64)
- 2589650000 - 25mm Halogen-Free Cable Duct, 2000mm Length, Light Grey (Pack of 84)
- 2589640000 - PVC Cable Duct 60mm x 60mm, 2000mm Length, RoHS Compliant (Pack of 24)
- 2589630000 - 2000mm PVC Cable Duct, 75mm x 37.5mm, RoHS Compliant (Pack of 32)
- 2589620000 - PVC Floor Cable Duct, 2000mm, 80mm x 60mm, Lead-Free (Pack of 24)
- 2589610000 - 2m PVC Cable Duct, 50mm x 37.5mm, RoHS Compliant (Pack of 32)
- 2589600000 - Grey PVC Cable Duct 40mm x 80mm, 2000mm Long (Pack of 24)
- 2589590000 - 2M Grey PVC Cable Duct 37.5mm x 37.5mm, RoHS Compliant (Pack of 48)
- 2589580000 - 75mm x 25mm PVC Cable Duct, 2000mm Long (Pack of 32)
- 2589570000 - PVC Cable Duct 60x80mm, 2000mm Length, Removable Lid (Pack of 24)
- 2589560000 - ROHS Compliant 50mm x 25mm PVC Cable Duct, 2m Length (Pack of 52)
- 2589550000 - 80mm PVC Cable Duct, Floor Use, RoHS Compliant (Pack of 24)
- 2589540000 - 2000mm PVC Cable Duct with Lid, 37.5mm High (Pack of 64)
- 2589530000 - 2000mm PVC Cable Duct, 60mm H x 100mm W, RoHS Compliant (Pack of 20)
- 2589520000 - PVC Cable Duct 25x25mm, 2000mm Length, RoHS Compliant (Pack of 84)
- 2589510000 - 80mm x 100mm Grey PVC Cable Duct, 2000mm Long (Pack of 16)
- 2589500000 - 100mm x 120mm Lead-Free PVC Cable Duct, 2000mm Long (Pack of 8)
- 2589490000 - 80mm x 120mm Lead-Free PVC Cable Duct, 2000mm Length (Pack of 16)
- 2589480000 - Square PVC Cable Duct Corner 90mm x 90mm, 2000mm Long (Pack of 8)
- 2589470000 - PVC Cable Duct 60mm x 120mm x 2000mm with Lid (Pack of 16)
- 2589460000 - 110mm PVC Cable Duct Corner, 2000mm Long, RoHS Compliant (Pack of 8)
- 2589450000 - PVC Cable Duct 100mm x 100mm, 2m Length, RoHS Compliant (Pack of 16)
- 2589440000 - 80mm x 100mm Lead-Free PVC Cable Duct, 2000mm Length (Pack of 16)
- 2589430000 - CBC 25/20 BK Polypropylene Cable Hose, 20000mm, 25mm Diameter (Pack of 20)
- 2589420000 - 60mm x 100mm PVC Cable Duct with Lid, 2000mm Length (Pack of 20)
- 2589410000 - 50mm Halogen-Free Cable Duct, 2m Length, RoHS Compliant (Pack of 24)
- 2589400000 - PVC Cable Duct 100x80mm, 2000mm Length, RoHS Compliant (Pack of 16)
- 2589390000 - RoHS Compliant Halogen-Free Cable Duct, 75mm x 50mm, 2000mm Long (Pack of 24)
- 2589380000 - PVC Cable Duct 80mm x 80mm, 2000mm, RoHS Compliant (Pack of 24)
- 2589370000 - PVC Cable Duct 2000mm x 80mm x 60mm, Flammability V-0 (Pack of 24)
- 2589360000 - 50x75mm Halogen-Free Cable Duct, Black PPE, 2000mm Long (Pack of 24)
- 2589350000 - 40x80mm PVC Cable Duct, 2000mm Length, RoHS Compliant (Pack of 24)
- 2589340000 - 75mm Halogen-Free Cable Duct, 2000mm Length, ROHS Certified (Pack of 16)
- 2589330000 - 2000mm PVC Cable Duct, 100mm x 60mm, RoHS Compliant (Pack of 16)
- 2589320000 - Halogen-Free Cable Duct 50mm x 100mm, 2000mm Long (Pack of 16)
- 2589310000 - PVC Cable Duct 80x60mm x 2000mm, Fire Resistant V-0 (Pack of 24)
- 2589300000 - PVC Cable Duct 60mm x 2000mm with Lid, Lead-Free (Pack of 24)
- 2589290000 - 75mm Halogen-Free Cable Duct, ROHS Compliant, 2000mm Long (Pack of 16)
- 2589280000 - 40mm x 60mm RoHS PVC Cable Duct, 2000mm Length (Pack of 24)
- 2589270000 - 75mm x 125mm Halogen-Free Cable Duct, 2m with Lid (Pack of 12)
- 2589260000 - 100mm x 40mm PVC Cable Duct with Lid, RoHS Compliant (Pack of 16)
- 2589250000 - 25mm Light Grey Cable Duct Cover, 2000mm Long (Pack of 2)
- 2589240000 - PVC Cable Duct 80mm x 40mm, 2000mm Length, Lightweight (Pack of 24)
- 2589230000 - Grey 60mm x 40mm PVC Cable Duct, 2m Compliance with RoHS (Pack of 36)
- 2589220000 - 37.5mm PC-ABS Cable Duct Cover, 2000mm Length (Pack of 2)
- 2589210000 - 2000mm Grey PVC Cable Duct, 40mm x 40mm, RoHS Compliant (Pack of 40)
- 2589200000 - 50mm x 2m Light Grey Snap-On Cable Duct Cover (Pack of 2)
- 2589190000 - PVC Cable Duct 100mm x 25mm, 2000mm Length, Lid Included (Pack of 24)
- 2589180000 - 2000mm PVC Cable Duct with Slit & Lid, 80mm Height (Pack of 32)
- 2589170000 - Light Grey Cable Duct Cover 75mm x 2000mm, RoHS Compliant (Pack of 2)
- 2589150000 - 60mm x 25mm Lead-Free PVC Cable Duct, 2m Length (Pack of 40)
- 2589140000 - 2m Light Grey Cable Duct Cover, 100mm Width (Pack of 2)
- 2589130000 - PVC Cable Duct 2000mm x 40mm with Lid and RoHS Compliant (Pack of 60)
- 2589120000 - 125mm x 2000mm Light Grey Cable Duct Cover (Pack of 2)
- 2589110000 - 2000mm Lead-Free PVC Cable Duct, 30mm x 25mm (Pack of 80)
- 2589100000 - 2m PVC Cable Duct 40mm x 15mm for Efficient Management (Pack of 72)
- 2589090000 - 25mm Wide Snap-On Cable Duct Cover, 2m Long (Pack of 2)
- 2589080000 - 30mm x 15mm PVC Cable Duct, 2000mm Length (Pack of 96)
- 2589070000 - 37.5mm Dark Grey Cable Duct Cover, 2m Long, Durable PPE (Pack of 2)
- 2589060000 - PVC Cable Duct 2000mm, 17mm Height, Slotted Design (Pack of 120)
- 2589050000 - 50mm x 2000mm RoHS-Compliant Cable Duct Cover (Pack of 2)
- 2589040000 - 100mm x 200mm PVC Cable Duct, 2000mm Length (Pack of 8)
- 2589030000 - PVC Cable Duct 80mm x 200mm, 2m Length, Non-Tracking (Pack of 8)
- 2589020000 - 75mm Dark Grey Cable Duct Cover, 2000mm Length (Pack of 2)
- 2589010000 - 2000mm PVC Cable Duct for Effective Cable Management (Pack of 8)
- 2589000000 - Dark Grey Cable Duct Cover, 100mm x 2000mm, Snap-On Design (Pack of 2)
- 2588990000 - 2000mm PVC Cable Duct with Lid and Rails (Pack of 8)
- 2588980000 - 125mm Dark Grey Cable Duct Cover with Snap-On Lid (Pack of 2)
- 2588970000 - 80mm x 150mm Lead-Free PVC Cable Duct, 2000mm Length (Pack of 12)
- 2588960000 - 60x150mm PVC Cable Duct with Lid, RoHS Compliant (Pack of 12)
- 2588950000 - 100,000mm PET Protective Cable Hose, 10mm Diameter (Pack of 200)
- 2588940000 - PVC Cable Duct 100mm x 120mm, 2000mm Length, RoHS Compliant (Pack of 8)
- 2588930000 - PET Protective Cable Hose, 200000mm, 10-18mm Bundle Diameter (Pack of 200)
- 2588760000 - 100,000mm Protective Cable Hose Coil, 10mm Diameter (Pack of 25)
- 2588920000 - PVC Cable Duct 80mm x 120mm, 2000mm Length, RoHS Compliant (Pack of 16)
- 2588910000 - PVC Cable Duct 2000mm x 60mm x 120mm, Lead-Free (Pack of 16)
- 2588900000 - PET Protective Cable Hose, 100000mm x 30mm, Temperature Range -50 to 150°C (Pack of 100)
- 2588890000 - 40mm x 120mm PVC Cable Duct with Lid and Slotted Panels (Pack of 20)
- 2588880000 - 100m PET Protective Cable Hose, 30mm Diameter, Max 45mm (Pack of 100)
- 2588870000 - 2000mm PVC Cable Duct, 150mm Height, UL V-0 Rated (Pack of 8)
- 2588860000 - 50mm PET Cable Hose, 50m Length, -50 to 150°C Rated (Pack of 50)
- 2588850000 - PVC Cable Duct 100mm x 2000mm with Lid and Halogen Rating (Pack of 16)
- 2588840000 - 80mm x 100mm PVC Cable Duct, 2000mm Length, Lead-Free (Pack of 16)
- 2588830000 - 400000mm Cable Hose Coil, 3mm Diameter, RoHS Compliant (Pack of 50)
- 2588820000 - Grey PVC Cable Duct 60x100mm, 2m Length, RoHS Compliant (Pack of 20)
- 2588810000 - CBC-SP Protective Cable Hose Coil, 200m x 6mm, Polyethylene (Pack of 25)
- 2588800000 - 2000mm PVC Cable Duct, 40mm x 100mm, RoHS Compliant (Pack of 16)
- 2588790000 - 2000mm PVC Cable Duct, 100x80mm, RoHS Compliant (Pack of 16)
- 2588780000 - 100m Polyethylene Protective Cable Hose Coil, 8mm-70mm Bundle (Pack of 25)
- 2588770000 - PVC Cable Duct 80mm x 80mm, 2000mm in Grey (Pack of 24)
- 2588750000 - 80mm x 60mm Grey PVC Cable Duct, 2000mm Long (Pack of 24)
- 2588740000 - 100,000mm Polyethylene Cable Hose Coil, 14-120mm Diameter (Pack of 25)
- 2588730000 - 40mm x 80mm PVC Cable Duct, 2000mm Length (Pack of 24)
- 2588720000 - 2m PVC Cable Duct 100mm x 60mm, RoHS Compliant (Pack of 16)
- 2588710000 - Polyethylene Cable Hose Coil 60000mm, 14mm Diameter (Pack of 20)
- 2588700000 - PVC Cable Duct 80mm x 60mm, 2m with Lid (Pack of 24)
- 2588690000 - Polyethylene Cable Hose Coil, 4000cm x 3mm, RoHS Compliant (Pack of 50)
- 2588680000 - 2000mm PVC Cable Duct 60mm x 60mm with Lid (Pack of 24)
- 2588670000 - Polyethylene Cable Hose Coil, 200m Length, 6mm Diameter (Pack of 25)
- 2588660000 - 40x60mm PVC Cable Duct, 2000mm Length, RoHS Compliant (Pack of 24)
- 2588650000 - 30mm x 60mm PVC Cable Duct, 2m Length, RoHS & UL Certified (Pack of 32)
- 2588640000 - 100m Polyethylene Cable Hose Coil, 12-100mm Diameter (Pack of 25)
- 2588630000 - 100mm x 40mm PVC Cable Duct, 2000mm Length (Pack of 16)
- 2588620000 - 100000mm White Cable Hose Coil, RoHS Compliant, V-2 Rated (Pack of 25)
- 2588610000 - 80mm x 40mm Grey PVC Cable Duct, 2000mm Length (Pack of 24)
- 2588600000 - 60mm x 40mm Cable Duct, 2000mm Long, Durable Design (Pack of 36)
- 2588590000 - 400,000mm Black Polyethylene Cable Hose Coil (Pack of 50)
- 2588580000 - 40mm x 2000mm PVC Cable Duct with Lid (Pack of 40)
- 2588570000 - RoHS Compliant Protective Cable Hose Coil, 200000mm x 6mm (Pack of 25)
- 2588560000 - 30mm x 40mm Lead-Free PVC Cable Duct, 2m Long (Pack of 48)
- 2588550000 - 100m Polyethylene Protective Hose Coil, 8-70mm Diameter (Pack of 25)
- 2588540000 - PVC Cable Duct 100mm x 25mm, 2000mm, Lead-Free with Lid (Pack of 24)
- 2588530000 - 80mm x 25mm Lead-Free PVC Cable Duct, 2000mm Long (Pack of 32)
- 2588520000 - Polyethylene Cable Hose Coil, 100mm Max Diameter, 100m Length (Pack of 25)
- 2588510000 - PVC Cable Duct 60mm x 25mm, 2000mm Length (Pack of 40)
- 2588500000 - Black 100m Polyethylene Cable Hose Coil, 12mm Diameter (Pack of 25)
- 2588490000 - CBC 8/100 BK Polypropylene Hose, 100000mm x 8mm, RoHS Compliance (Pack of 100)
- 2588480000 - 50m Black Polypropylene Cable Hose, 15mm Diameter (Pack of 50)
- 2588470000 - 30m Polypropylene Cable Hose for 20mm Diameter Cables (Pack of 30)
- 2588460000 - 2000mm PVC Cable Duct 40mm High, RoHS Compliant (Pack of 60)
- 2588450000 - PVC Cable Duct 30mm x 25mm, 2m, Non-Tracking, RoHS Compliant (Pack of 80)
- 2567310000 - RoHS Compliant IP54 White Filter Mat, 284mm Dimensions (Pack of 5)
- 2562850000 - PA Cable Duct Tag Holder, 30mm x 25mm Dimensional Labeling Solution (Pack of 150)
- 2562800000 - Flexible 40mm Wiring Duct, Polypropylene, Adhesive Mounting (Pack of 50)
- 2562790000 - 30mm Flexible Wiring Duct, 500mm Length, RoHS Compliant (Pack of 50)
- 2562780000 - 500mm CD-FLEX Flexible Wiring Duct, 20mm x 20mm (Pack of 50)
- 2562770000 - 12.5mm CD-FLEX Flexible Duct, Durable Polypropylene (Pack of 50)
- 2562720000 - 224mm Durable Aluminum Rivet Tool with Rotatable Head (Pack of 4)
- 2562710000 - 224mm Aluminium Expanding-Rivet Tool, 6.5mm Diameter (Pack of 4)
- 2562700000 - EXRV 4.5 Rivet, 27.5mm x 8.9mm, RoHS Compliant (Pack of 1000)
- 2562690000 - Black Push Rivet 32mm x 11mm, RoHS Compliant (Pack of 1000)
- 2562680000 - PVC Cable Duct Tag Rail, 15mm x 1000mm, RoHS Compliant (Pack of 150)
- 2558280000 - IP20 Grey-White Humidity Switch, 40-90% R.F.
- 2558270000 - IP20 Humidity Switch in Grey-White, RoHS Compliant
- 2558260000 - THSW - -20 to 80°C Temperature Switch with NO Contacts
- 2558250000 - Grey-White Temperature Switch -20°C to 80°C with NC/NO Contacts
- 2558240000 - NO Temperature Switch, 0° to 60°C with Rail Mount
- 2558230000 - Temperature Switch - NC, -20 to 80°C, Rail Mounting
- 2558220000 - -20 to 40 °C Temperature Switch with 10A Contact
- 2558210000 - -20 to 80 °C Temperature Switch with Screw Connection
- 2558200000 - Precision Temperature Switch -20 to 80°C for Rail Mounting
- 2558190000 - THSW 1K Temperature Switch, 0°C to 60°C Range
- 2558180000 - THSW 3K Temperature Switch -20°C to 40°C, Reliable Design
- 2558170000 - Versatile Temperature Switch -20 to 40°C with NO/NC Contacts
Couldn't load pickup availability

*Data provided on this page is subject to change based on different manufacturers' variances
** Images are for display purposes only refer to Product Technical Details for accurate information on the product.
In the case the material only comes in a predetermined color or doesn’t come with any color
Description:
Optimize your space with this cable duct floor duct, designed for efficiency and practicality Measuring 60 mm in height and 80 mm in width, this duct spans a length of 2000 mm Crafted from lead-free PVC, it guarantees safety and reliability in your installations Please note that this product will no longer be available after December 31, 2025.
Features and Benefits:
•Compliant with RoHS without exemption.
•Includes a lid and is non-tracking.
•UL 94 flammability rating of V-0.
•Usable cross-section is 4,200 mm².
•Flexible wiring duct is not available.
•Operates within a temperature range of -5 to 60 °C.
Specifications:
| Height | 60 mm |
| Width | 80 mm |
| Length | 2000 mm |
| Height (inches) | 2.362 inch |
| Width (inches) | 3.15 inch |
| Length (inches) | 78.74 inch |
| Basic material | PVC / lead-free |
| Slit gap | 12 mm |
| Slit width | 8 mm |
| Operating temperature range | -5...60 °C |
| Standards | In accordance with DIN EN 50085 |
| Type of mounting | when screwed in, with adhesive, riveted |
| Floor rails | 1 |