Skip to product information
1 of 12

WBS-015 - Heavy-Duty 39" Hay Spear for Skid Steer Loaders

WBS-015 - Heavy-Duty 39" Hay Spear for Skid Steer Loaders

SKU: SKU: WBS-015 Download PDF

Variant:
  • WBS-015 - Heavy-Duty 39" Hay Spear for Skid Steer Loaders
Regular price Now $266.38
Regular price BEFORE   $0.00 Sale price Now $266.38
Sold out
IN STOCK
Shipping Available
Free shipping on orders above $1000.* Only on standard purchases of cables and wires.
View full details
Product Information

*Data provided on this page is subject to change based on different manufacturers' variances
** Images are for display purposes only refer to Product Technical Details for accurate information on the product.
In the case the material only comes in a predetermined color or doesn’t come with any color

Description:

Introducing our robust bale spear, capable of handling loads up to 1600 lbs with ease The spear extends 39 inches and is crafted from high-strength spring steel, making it perfect for transporting large hay bales Designed for compatibility with bucket skid steer loaders, its straightforward installation process makes it an essential tool for both agricultural and construction tasks Engineered for lasting performance, this hay spear features reinforced connection points to address welding concerns.

The spear and thread diameters have been thoughtfully widened, and the thread has been lengthened for added durability Including a unique configuration of one main spear and two additional 175-inch stabilizer spears, this setup forms a solid triangle to ensure your hay remains secure during transport With only four simple installation steps, attaching the spears involves securing them with a chain tightener, chain, and U-shaped buckles to the thin-walled end of the bucket.

Furthermore, this hay bale spear boasts a corrosion-proof and rust-resistant design, ensuring it stays in prime condition even after frequent use Its versatility allows for a range of applications beyond just hay, making it a practical addition to your equipment.

Features and Benefits:

    •1600 lbs High Load Capacity: VEVOR hay spear boasts an impressive 1600 lbs load capacity. With an enhanced 1.18" thread diameter, and 2.05" thread length, it ensures stability, even when dealing with large hay bales, preventing tipping..

    •Premium Spring Steel: The bale spear shaft is crafted from high-strength spring steel material with a powder coating, making it robust, and resistant to bending, breakage, and corrosion. The 39" shaft effortlessly penetrates thick hay stacks, ensuring long-lasting durability..

    •Universal Compatibility: Our hay bale spear is compatible with bucket skid steer loaders and tractors. The 60" extended chain that can fit various bucket sizes. Carefully measured for compatibility, you won't need to worry about it not fitting..

    •Easy Installation: With fewer components and straightforward assembly, even beginners can install the tractor hay spears effortlessly. The included self-locking nuts and external hex screws secure the long spears. Additionally, it includes a chain tightener, chain, and U-shaped buckles for added security..

    •Effortless Handling: Manual handling of hay is labor-intensive and time-consuming. With the VEVOR hay forks for tractor, you can efficiently move hay, greatly improving work efficiency. It's ideal for agricultural, landscaping, yard, and pasture applications, saving you time and effort..

    •Agricultural.

    •Landscaping.

    •Yard work.

    •Pasture applications.

Specifications:

 Item Model Number WBS-015
 Weight Capacity 1600 lbs/725 kg
 Number of Spears 1
 Number of Stabilizing Spears 2
 Product Weight 88.62 lbs/40.2 kg

 

Resources

Reviews

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)