Skip to product information
1 of 12

WBS-012 - 49" VEVOR Hay Spear with 1600lbs Capacity and Stabilizer Spears

WBS-012 - 49" VEVOR Hay Spear with 1600lbs Capacity and Stabilizer Spears

SKU: SKU: WBS-012 Download PDF

Variant:
  • WBS-012 - 49" VEVOR Hay Spear with 1600lbs Capacity and Stabilizer Spears
Regular price Now $299.38
Regular price BEFORE   $0.00 Sale price Now $299.38
Sold out
IN STOCK
Shipping Available
Free shipping on orders above $1000.* Only on standard purchases of cables and wires.
View full details
Product Information

*Data provided on this page is subject to change based on different manufacturers' variances
** Images are for display purposes only refer to Product Technical Details for accurate information on the product.
In the case the material only comes in a predetermined color or doesn’t come with any color

Description:

Optimize your heavy lifting tasks with the VEVOR Hay Spear, capable of supporting loads up to 1600 lbs Perfect for managing large bales, this durable tool is built to last and can be employed on both personal farms and commercial operations Its 49-inch length grants impressive reach and leverage, allowing for easy handling of bales of various sizes Installation is a breeze thanks to the quick attach spike forks, which simplify setup without the need for specialized tools.

This hay spear is compatible with a wide range of skid steer loaders, enhancing its versatility for multiple applications Equipped with two stabilizer spears, you can confidently transport bales without worrying about shifting Constructed from high-strength spring steel and finished with a protective powder coating, the design is engineered to resist bending, breakage, and corrosion over time The VEVOR hay spear is the essential solution for efficiently moving round bales, ensuring a secure grip for safe transport.

With features aimed at maximizing ease of use and enhancing productivity, this tool is an indispensable addition to your hay-moving equipment.

Features and Benefits:

    •1600 lbs high load capacity.

    •Premium spring steel construction.

    •Universal compatibility with most skid steer loaders and tractors.

    •Easy installation with fewer components.

    •Effortless handling of hay loads.

    •Ideal for agricultural use, landscaping, yard work, and pasture applications.

Specifications:

 Weight Capacity 1600 lbs/725 kg
 Number of Spears 1
 Number of Stabilizing Spears 2
 Product Weight 126.76 lbs/57.5 kg
 Main Frame Size(LxHxW) 45.7x22.4x5.7 in/1160x570x145 mm
 Spear Size(Dia. x L) 1.77 x 49.2 in/45 x 1250 mm
 Stabilizing Spear Size(Dia. x L) 1.26 x 17.5 in/32 x 430 mm

 

Resources

Reviews

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)