WBS-014 - 49" Heavy-Duty Hay Spear for Tractors, 3000 lbs Capacity
WBS-014 - 49" Heavy-Duty Hay Spear for Tractors, 3000 lbs Capacity
SKU: SKU: WBS-014 Download PDF
- WBS-014 - 49" Heavy-Duty Hay Spear for Tractors, 3000 lbs Capacity
- WBS-014 - 49" Heavy-Duty Hay Spear for Tractors, 3000 lbs Capacity
Couldn't load pickup availability

*Data provided on this page is subject to change based on different manufacturers' variances
** Images are for display purposes only refer to Product Technical Details for accurate information on the product.
In the case the material only comes in a predetermined color or doesn’t come with any color
Description:
Introducing the ultimate solution for small farm operations—the 49-inch hay spear Engineered to effortlessly lift heavy bales, this rugged tool simplifies the process of moving hay, making farm tasks significantly more manageable Its impressive length offers optimal leverage and stability during lifting, ensuring reliability with every use
Compatible with various tractors and skid steers, the hay spear excels at handling both round and square bales.
Its quick attachment system guarantees easy setup and transitions between tasks, allowing you to focus on what truly matters on your farm—getting the job done efficiently Compatible with popular brands like Kubota, Branson, and Bobcat, this implement enhances your existing equipment without complicated assembly
Built from high-strength materials, this hay spear boasts a remarkable capacity of up to 3000 lbs, making it suitable for larger bales and intensive lifting needs.
The superior construction guarantees longevity and dependable performance, crucial for the demands of farm life
Efficiency is at the forefront of the hay spear’s design, as it reduces the physical labor involved in moving heavy bales, allowing you to work smarter and save precious time This efficiency can significantly boost overall productivity on your farm, transforming the way you handle hay
SHipping is prompt and secure, ensuring your spear arrives in pristine condition, ready for immediate use.
This commitment to customer satisfaction means you’ll experience no delays, letting you tackle your hay tasks sooner while keeping your operations running smoothly
Additionally, the hay spear's versatile design allows for lifting from multiple angles across varied terrains, making it ideal for any environment, including those with uneven ground This ability to efficiently manage bales from different positions enhances the practical application of the tool on your farm.
Offering a compelling blend of quality and performance, the VEVOR hay spear represents an excellent value for your investment With its robust design and reliable capabilities, this spear is an indispensable asset for any farmer looking to optimize their workflow.
Features and Benefits:
•3000 LBS High Load Capacity: VEVOR hay spear boasts an impressive 3000 lbs load capacity..
•Premium Spring Steel: The bale spear shaft is crafted from high-strength spring steel material with a powder coating..
•Universal Compatibility: Our hay bale spear is compatible with most skid steer loaders and tractors with a quick attach system..
•Easy Installation: With fewer components and straightforward assembly, even beginners can install the tractor hay spears effortlessly..
•Effortless Handling: Manual handling of hay is labor-intensive and time-consuming. With the VEVOR hay forks for tractor, you can efficiently move hay, greatly improving work efficiency..
•Agricultural applications.
•Landscaping.
•Yard work.
•Pasture applications.
Specifications:
| Weight Capacity | 3000 lb/1360 kg |
| Number of Spears | 2 |
| Flexible Dimensions | 2.36 diameter, 1.18 thread diameter, and 2.05 thread length |
| Package A Net Weight | 120.15 lbs/54.5 kg |
| Package B Net Weight | 50.70 lbs/23 kg |