Skip to product information
1 of 12

WBS-023 - Adjustable Portable Scaffolding Platform, 880 lb Capacity

WBS-023 - Adjustable Portable Scaffolding Platform, 880 lb Capacity

SKU: SKU: WBS-023 Download PDF

Regular price Now $135.63
Regular price BEFORE   $0.00 Sale price Now $135.63
Sold out
IN STOCK
Shipping Available
Free shipping on orders above $1000.* Only on standard purchases of cables and wires.
View full details
Product Information

*Data provided on this page is subject to change based on different manufacturers' variances
** Images are for display purposes only refer to Product Technical Details for accurate information on the product.
In the case the material only comes in a predetermined color or doesn’t come with any color

Description:

Elevate your work efficiency with this innovative portable scaffolding, designed for effortless setup and takedown Crafted from 12 mm high-hardness galvanized steel pipes, it ensures robustness and stability through its unique multi-triangle structure Equipped with four adjustable legs, this scaffolding easily accommodates uneven surfaces while delivering reliable support The durable stainless steel frame offers a padded platform that can hold up to 880 pounds, making it an excellent choice for a variety of applications, from painting projects to maintenance tasks.

Features and Benefits:

    •Compact and Easy to Store when folded; reduces to a compact size of 36.42 x 21.14 x 5.31 inches and weighs only 43 lb/19.5 kg..

    •Strong Load-Bearing Capacity with a sturdy triangular support structure that holds up to 882 lb/400 kg when fully unfolded..

    •Adjustable Height offering four settings: 35.43 inches, 43.31 inches, 51.18 inches, and 59.06 inches for versatility..

    •Durable and High-Quality Construction using high-hardness alloy steel tubes with a galvanized surface for rust and corrosion resistance..

    •Quick and Easy Setup requiring no complicated installation, can be easily folded and stored in five simple steps..

Specifications:

 Item Model Number WBS-023
 Height 27.6/33.5/39.4/45.3 in/500/620/740 mm
 Table Size (L x W) 55.1 x 15.0 in/1400 x 380 mm
 Maximum Load Capacity 800 lbs/360 kg
 Net Weight 34.5 lbs/15.65 kg
 Main Material Galvanized Sheet (Q235)
 Product Size 73.4 x 21.1 x 35.4 in/1865 x 535 x 900 mm (Minimum Height)
 Folded Size 36.4 x 21.1 x 5.3 in/925 x 537 x 135 mm (Minimum Size)

 

Resources

Reviews

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)