WBS-022 - Adjustable Scaffolding Platform, 880 lb Capacity, Foldable Design
WBS-022 - Adjustable Scaffolding Platform, 880 lb Capacity, Foldable Design
SKU: SKU: WBS-022
- WBS-022 - Adjustable Scaffolding Platform, 880 lb Capacity, Foldable Design
- WBS-022 - Adjustable Scaffolding Platform, 880 lb Capacity, Foldable Design
Couldn't load pickup availability

*Data provided on this page is subject to change based on different manufacturers' variances
** Images are for display purposes only refer to Product Technical Details for accurate information on the product.
In the case the material only comes in a predetermined color or doesn’t come with any color
Description:
Experience effortless elevated work with this portable scaffolding, designed for convenience with a quick fold and unfold mechanism Crafted from 12 mm galvanized steel, it features a robust multi-triangle construction that guarantees stability Its four adjustable legs easily adapt to uneven terrain, providing reliable support for all your needs
Ideal for construction sites or DIY home projects, this scaffolding is built for mobility, allowing easy transport.
The innovative folding design not only saves time but also simplifies storage when not in use The solid triangular framework assures maximum stability, minimizing unwanted movement and providing a secure platform for your tasks
With individually adjustable telescopic legs, you can effortlessly customize the height to suit any working surface, ensuring a firm, safe setup every time The heavy-duty stainless steel frame supports a weight capacity of up to 880 pounds, making it versatile enough for a variety of applications, from painting to maintenance tasks.
Focus on your work with confidence, knowing that stability and strength are assured.
Features and Benefits:
•Compact and Easy to Store: The work platform is designed with convenience in mind. When folded, it reduces to a compact size of 32.48 x 20.28 x 5.31 inches and weighs only 39.2 lb/17.8 kg. Its lightweight design makes it easy to carry, store, and save space..
•Strong Load-Bearing Capacity: The sturdy triangular support structure allows the platform to safely hold up to 882 lb/400 kg when fully unfolded. This ensures a stable and reliable working surface convenient for all your elevated tasks..
•Adjustable Height for Versatility: The scaffolding platform offers a range of height adjustments, with four settings: 31.5 inches, 37.99 inches, 44.49 and 51 inches. This adaptability empowers you to tackle a wide range of tasks, from car washing to building renovations, with ease and confidence..
•Durable and High-Quality Construction: The steel step ladder is sturdy and durable, crafted from high-hardness alloy steel tubes with a 0.047-inch thickness. Its galvanized surface offers excellent resistance to rust and corrosion, while the non-slip feet provide stability on various surfaces..
•Quick and Easy Setup: No complicated installation is required. The ladder platform can be easily folded and stored in five simple steps, making setup and breakdown fast and hassle-free..
•This ladder can be used for maintenance and repairs to ceiling fans and lights, as well as an additional assembly table..
•It is suitable for tasks from car washing to building renovations..
Specifications:
| Item Model Number: | WBS-022 |
| Height: | 31.5/38.0/44.5/51.0 in/800/965/1130/1295 mm |
| Table Size (L x W): | 63.0 x 15.0 in/600 x 380 mm |
| Maximum Load Capacity: | 882 lbs/400 kg |
| Net Weight: | 39.2 lbs/17.8 kg |
| Main Material: | Galvanized Sheet (Q235) |
| Product Size: | 65.7 x 20.3 x 31.5 in/1670 x 515 x 800 mm (Minimum Height) |
| Folded Size: | 32.5 x 20.3 x 5.3 in/825 x 515 x 135 mm (Minimum Size) |