WBS-005 - 50" VEVOR Pallet Buster with Enhanced Pointed Tip & 2000 lbs Capacity
WBS-005 - 50" VEVOR Pallet Buster with Enhanced Pointed Tip & 2000 lbs Capacity
SKU: SKU: WBS-005 Download PDF
- WBS-005 - 50" VEVOR Pallet Buster with Enhanced Pointed Tip & 2000 lbs Capacity
- WBS-005 - 50" VEVOR Pallet Buster with Enhanced Pointed Tip & 2000 lbs Capacity
Couldn't load pickup availability

*Data provided on this page is subject to change based on different manufacturers' variances
** Images are for display purposes only refer to Product Technical Details for accurate information on the product.
In the case the material only comes in a predetermined color or doesn’t come with any color
Description:
Enhance your dismantling projects with the VEVOR pallet buster, expertly designed with a slightly curved pointed tip for effortless engagement with wooden boards, boosting your efficiency in the process Its reinforced welding area guarantees a sturdy and reliable tool built to last Capable of handling loads up to 2000 lbs, this durable puller resists wear and tear, even with prolonged use Featuring a 4-inch tooth spacing, it adapts easily to most pallet sizes, minimizing the need for frequent tool changes.
The 50-inch handle provides excellent leverage, allowing for comfortable use without excessive bending This versatile deck wrecker is perfect for dismantling pallets, decks, and more, making it an excellent choice for those looking to repurpose or replace wood materials.
Features and Benefits:
•Speed Up Your Tear-Down: Hook those boards in a snap! Our pallet buster comes with an upgraded curved-tip design and a lighter weight, making the whole disassembly process faster than ever..
•One Size Fits All: Swap tools less and save more time! Our pallet puller's 4-inch universal design tackles multiple pallet sizes with ease. Say goodbye to tedious tool changes and hello to a smoother workflow—be it boards, flooring, nails, or tiles..
•Built to Last: Forget flimsy, meet robust! Designed with extra welding area for stability and robustness, our deck board removal tool can handle a load of up to 2000 lbs. This isn't your average run-of-the-mill tool; it's built for the long haul..
•Less Bend, More Ease: Cut the back-bending labor with the 50-inch extended handle on our demolition bar. Leverage has never felt so effortless. Get more done without the backache, thus making your removal tasks more comfortable..
•One Tool, Many Jobs: Say hello to our built-in nail puller on this pallet buster tool! Dismantle those pallets and pull out those stubborn nails without ever switching tools..
•Dismantling pallets.
•Deck board removal.
•Demolition work requiring the reuse of boards.
Specifications:
| Item Model Number | WBS-005 |
| Total Length | 54 inches/137.2 cm |
| Handle Length | 50 inches/127 cm |
| Handle Sleeve | 4.7 inches/12 cm |
| Fork Teeth Spacing | 4 inches/102 mm |
| Number of Fork Teeth | 2 |
| Fork Teeth Width | 0.62 inches/16 mm |
| Product Weight | 11.02 lbs/5.0 kg |
| Weight Capacity | 2000 lbs/907 kg |
| Material | Q235 Carbon Steel |
| Product Size | 54.02 x 5.63 x 6.5 inches/1372 x 143 x 165 mm |