706122-08 - 1/2-in MPT Hex Nipple Fitting, 1-1/2 in Long, Lead-Free Brass
706122-08 - 1/2-in MPT Hex Nipple Fitting, 1-1/2 in Long, Lead-Free Brass
SKU: SKU: 706122-08
- 706122-08 - 1/2-in MPT Hex Nipple Fitting, 1-1/2 in Long, Lead-Free Brass
- 706122-08 - 1/2-in MPT Hex Nipple Fitting, 1-1/2 in Long, Lead-Free Brass
- 28821 - 1/4-in x 1/8-in Brass Hex Nipple with Nickel Plating
- 28802 - Brass Hex Nipple Fitting, 1/4-in Male BSP x 1/4-in Male BSP, Nickel Plated
- 28976 - 1/4-in Male BSPP x 1/4-in MNPT Brass Hex Nipple Fitting
- 28804 - 3/8-in Male BSP x 1/4-in Male BSP Brass Hex Nipple with Nickel Plating
- 28824 - Brass Hex Nipple - 3/8-in Male BSP x 1/4-in Male BSP, Nickel Plated
- 28805 - 3/8-in Male BSP Hex Nipple, Brass, Nickel-Plated Double Connection
- 28978 - Brass Hex Nipple - 3/8-in Male BSPP x 3/8-in MNPT Fitting
- 28807 - 1/2-in Male BSP to 3/8-in Male BSP Brass Hex Nipple, Nickel-Plated Finish
- 28826 - 1/2-in Male BSP x 1/8-in Male BSP Brass Hex Nipple with Nickel-Plated Finish
- 28827 - 1/2-in Male BSP x 1/4-in Male BSP Brass Hex Nipple Fitting
- 28811 - 3/4-in Male BSPP Steel Hex Nipple Fitting with Nickel-Plated Finish
- 28810 - Steel Hex Nipple - 3/4-in Male BSPP x 1/2-in Male BSPP, Nickel-Plated Finish
- 28832 - Brass Hex Nipple, 3/4-in Male BSP x 1/2-in Male BSP, Nickel Plated
- 706122-02 - 1/8-in MPT x 1/8-in MPT Hex Nipple, 0.91 in Lead-Free Brass
- 28833 - Brass Hex Nipple - 3/4-in Male BSP x 3/4-in Male BSP, Nickel-Plated Finishing
- 706122-04 - 1/4-in MPT Lead-Free Brass Hex Nipple, 1.12 in Length
- 706123-0402 - Reducing Hex Nipple 1/4-in MPT x 1/8-in MPT, 1 inch Lead-Free Brass Fitting
- 706322-04 - 1/4-in FPT x 1/4-in FPT Lead-Free Brass Long Hex Nipple
- 706122-06 - 3/8-in MPT x 3/8-in MPT Lead-Free Brass Hex Nipple, 1-1/4 in Length
- 706123-0602 - Reducing Hex Nipple, 3/8-in MPT x 1/8-in MPT, 1.11 in Lead-Free Brass
- 706123-0604 - Lead-Free Brass Reducing Hex Nipple, 3/8-in MPT x 1/4-in MPT, 1.19 in Length
- 706123-0804 - 1/2-in MPT x 1/4-in MPT Reducing Hex Nipple, Lead-Free Brass, 1.34 in Length
- 706123-0806 - Reducing Hex Nipple 1/2-in MPT x 3/8-in MPT Lead-Free Brass, 1.41 in Length
- 28820 - 1/8-in Male BSPT Brass Hex Nipple, Nickel-Plated Finish
- 63720 - 1/8-in MPT x 1/8-in MPT Hex Nipple Fitting in 316 Stainless Steel
- 62720 - 1/8-in MPT x 1/8-in MPT 304 Stainless Steel Hex Nipple Fitting
- 62721 - 1/4-in MPT Stainless Steel Hex Nipple Fitting ASME B1.20.1
- 28822 - Brass Hex Nipple Fitting 1/4-in Male BSP x 1/4-in Male BSP, Nickel-Plated
- 62722 - 3/8-in MPT 304 Stainless Steel Hex Nipple for Air, Water, Oil, Gas, and Steam
- 706122-12-7337 - 3/4 in MPT x 3/4 in MPT Extra Long Lead-Free Brass Hex Nipple
- 63722 - 3/8-in MPT x 3/8-in MPT Hex Nipple Fitting, 316 Stainless Steel, 150 psi Rated
- 63721 - 1/4-in MPT x 1/4-in MPT 316 Stainless Steel Hex Nipple Connector
- 28825 - 3/8-in Male BSP Brass Hex Nipple Connector with Nickel-Plated Finish
- 28800 - 1/8-in Male BSP Hex Nipple Brass Fitting with Nickel-Plated Finish
- 28801 - Brass Hex Nipple Fitting, 1/4-in Male BSP x 1/8-in Male BSP, Nickel Plated
- 706123-1208 - 3/4-in MPT x 1/2-in MPT Reducing Hex Nipple, 1.81 in Length, Lead-Free Brass
- 62723 - 1/2-in MPT Hex Nipple Fitting, 304 Stainless Steel, ASME B1.20.1, 150 psi Rated
- 28823 - Nickel-Plated Brass Hex Nipple 3/8-in Male BSP x 1/8-in Male BSP Fitting
- 63723 - 1/2-in MPT x 1/2-in MPT 316 Stainless Steel Hex Nipple
- 62724 - 3/4-in MPT x 3/4-in MPT 304 Stainless Steel Hex Nipple Fitting
- 706122-12 - 3/4-in MPT Hex Nipple, 1.55 in Length, Lead-Free Brass
- 63724 - 3/4-in MPT x 3/4-in MPT Stainless Steel Hex Nipple, 150 psi Pressure Rated
- 28803 - 3/8-in x 1/8-in Brass Hex Nipple with Nickel Finish
- 62725 - 1-in MPT x 1-in MPT 304 Stainless Steel Hex Nipple Fitting
- 28829 - 1/2-in Male BSPT Brass Hex Nipple with Nickel-Plated Finish
- 28816 - 1/4-in BSPT x 1/4-in MIP Brass Hex Nipple with Nickel-Plated Finish
- 706122-16 - 1-3/4 in Lead-Free Brass Hex Nipple, 1-in MPT x 1-in MPT
- 63725 - 1-in MPT x 1-in MPT Stainless Steel Hex Nipple, 150 psi, ASME B1.20.1 Compliant
- 28808 - 1/2-in Male BSP Brass Hex Nipple Fitting with Nickel Plating
- 28815A - Industrial Component with Multiple Connection Points and Durable Material
- 28815 - Brass Hex Nipple 1/8-in BSPT x 1/8-in MIP, Nickel-Plated Fitting
- 28817 - 3/8-in BSPT x 3/8-in MIP Brass Hex Nipple Fitting
- 63726 - 1-1/4-in MPT Hex Nipple Fitting in 316 Stainless Steel for Air, Water, Oil, Gas, Steam
- 62726 - 1-1/4-in MPT Stainless Steel Hex Nipple for Air, Water, Oil, Gas, Steam
- 63727 - 1-1/2-in MPT Hex Nipple, 316 Stainless Steel, 150 psi Rated
- 62727 - 1-1/2 in x 1-1/2 in Stainless Steel Hex Nipple MPT for Air, Water, Oil, Natural Gas, Steam
- 28818 - 1/2-in BSPT x 1/2-in MIP Brass Hex Nipple Fitting with Nickel Plating
- 28977 - 3/8-in Male BSPP to 1/4-in MNPT Brass Hex Nipple Fitting
- 28812 - 1-in x 3/4-in Male BSPP Brass Reducing Nipple with Nickel Plated Finish
- 28979 - 1/2-in Male BSPP to 1/2-in MNPT Brass Hex Nipple Fitting
- 62728 - 2-in MPT Stainless Steel Hex Nipple, ASME B1.20.1, 150 psi Rating
- 28910 - 1-in Male BSPT Brass Pipe Nipple Fitting
- 63728 - 2-in MPT Stainless Steel Hex Nipple, ASME B1.20.1, 150 psi, 2-11-1/2 Thread Size
- 28945 - 1-in Male BSPT x 3/4-in Male BSPT Brass Pipe Nipple for Plumbing Applications
- 28813 - 1-in Male BSPP x 1-in Male BSPP Nickel Plated Brass Reducing Nipple
- 28819 - Brass Hex Nipple 3/4-in BSPT x 3/4-in MIP, Nickel-Plated Finish
- 28839 - 1-in Male BSPT x 1-in MNPT Brass Pipe Nipple, Nickel-Plated Finish
Couldn't load pickup availability

*Data provided on this page is subject to change based on different manufacturers' variances
** Images are for display purposes only refer to Product Technical Details for accurate information on the product.
In the case the material only comes in a predetermined color or doesn’t come with any color
Description:
Introducing the Hex Nipple from ANDERSON METALS, a reliable plumbing fitting expertly crafted from lead-free brass This versatile nipple connects pipes with a uniform size of 1/2 inch on both sides, making it compatible with brass and steel conduits alike It features a 087-inch hex width for easy installation and boasts an overall length of 1-1/2 inches with a threading of 1/2-14 This fitting offers both quality and functionality for your plumbing needs.
Features and Benefits:
•Lead-free brass construction.
•Suitable for brass or steel pipe.
•Hex size of 0.87 inches.
Specifications:
| Connection Size 1 | 1/2 in |
| Connection Size 2 | 1/2 in |
| Connection Type | MPT|MPT |
| Connection Type 1 | MPT |
| Connection Type 2 | MPT |
| Fitting Type | Nipple |
| Length | 1-1/2 in |
| Material | Brass |
| Material Construction | Lead-Free Brass |
| Thread Size | 1/2-14 |