Skip to product information
1 of 1

40127 - 1-1/4 in MPT x 1-1/4 in MPT Seamless Pipe Nipple, 5 in Long, Lead-Free Red Brass

40127 - 1-1/4 in MPT x 1-1/4 in MPT Seamless Pipe Nipple, 5 in Long, Lead-Free Red Brass

SKU: SKU: 40127

Variant:
  • 40127 - 1-1/4 in MPT x 1-1/4 in MPT Seamless Pipe Nipple, 5 in Long, Lead-Free Red Brass
Regular price Now $17.51
Regular price BEFORE   $0.00 Sale price Now $17.51
Sold out
IN STOCK
Shipping Available
Free shipping on orders above $1000.* Only on standard purchases of cables and wires.
View full details
Product Information

*Data provided on this page is subject to change based on different manufacturers' variances
** Images are for display purposes only refer to Product Technical Details for accurate information on the product.
In the case the material only comes in a predetermined color or doesn’t come with any color

Description:

Enhance your plumbing projects with the MIDLAND INDUSTRIES 40127 Seamless Pipe Nipple This reliable piece features male pipe threads (MPT) on both ends, with a size of 1-1/4 inches and a length of 5 inches Crafted from lead-free red brass, this pipe nipple adheres to safety standards for peace of mind With an inside nominal diameter of 1368 inches and an outer diameter of 166 inches, it fulfills various dimensional requirements, including ANSI B1.

201 and MS 51846 standards.

Features and Benefits:

    •Lead-free red brass construction.

    •Meets ANSI B1.20.1, WW-N-351, MS 51846 standards.

Specifications:

 Connection Size 1 1-1/4 in
 Connection Size 2 1-1/4 in
 Connection Type MPT
 Diameter 1.368 in ID x 1.66 in OD
 Fitting Type Nipple
 Length 5 in
 Material Brass
 Material Construction Lead-Free Red Brass
 Pressure Class 125 lb
 Pressure Rating 690 psi at 100 deg F
 Schedule Rating SCH 40
 Temperature Rating -20 to 400 deg F
 Thread Size 1-1/4-11-1/2

 

Reviews

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)