Skip to product information
1 of 1

706113-0424 - 1-1/2 in Long Lead-Free Brass Nipple, 1/4-in MPT x 1/4-in MPT

706113-0424 - 1-1/2 in Long Lead-Free Brass Nipple, 1/4-in MPT x 1/4-in MPT

SKU: SKU: 706113-0424

Regular price Now $1.37
Regular price BEFORE   $0.00 Sale price Now $1.37
Sold out
IN STOCK
Shipping Available
Free shipping on orders above $1000.* Only on standard purchases of cables and wires.
View full details
Product Information

*Data provided on this page is subject to change based on different manufacturers' variances
** Images are for display purposes only refer to Product Technical Details for accurate information on the product.
In the case the material only comes in a predetermined color or doesn’t come with any color

Description:

Connect your brass or steel plumbing with the Long Nipple by Anderson Metals, measuring 1-1/2 inches in length Equipped with 1/4-inch male pipe threads on both sides, this nipple guarantees a reliable connection Crafted from lead-free brass, it combines safety and durability for your piping needs.

Features and Benefits:

    •Lead-free construction for safety.

    •Designed for use with brass or steel pipe.

Specifications:

 Connection Size 1 1/4 in
 Connection Size 2 1/4 in
 Connection Type MPT|MPT
 Connection Type 1 MPT
 Connection Type 2 MPT
 Diameter 1/4 in
 Fitting Type Nipple
 Length 1-1/2 in
 Material Brass
 Material Construction Lead-Free Brass
 Thread Size 1/4-18

 

Reviews

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)